|
Waterman
Hospital Replacement Facility
Tavares, Florida
This project included over 365,000 square feet
of new construction and renovation to the exisiting
120 acre hospital campus. A 204-bed replacement
hospital and the renovation of an exisiting three
story building encompassed this project. Wal-Mark
Contracting performed the exterior framing, soffits,
sheathing and stucco on this project. We provided
a complete drywall package which consisted of
the interior framing, inventory and installation
of hollow metal frames, hanging and finishing
drywall. In addition, we provided firestopping
and stenciling of tops of walls, and installed
GRFG column covers. This project required an extreme
attention to detail by our foremen to meet AHCA
standards and code requirements.
<<
Back to Featured Projects
|